Article   |     |   25.03.2021

Seven ways to reduce non-productive time of your land rig

Drilling operations can be interrupted by the malfunction of equipment and systems, or the lack of competence of drilling personnel. Aside from the safety implications, these interruptions result in Non-Productive Time (NPT), which is costly.

Our complimentary guide identifies seven ways to reduce non-productive time of your land rig, helping you:

  • Improve maintenance management of your land rig
  • Reduce operating and inspection costs by up to 50%
  • Reduce failures
  • Mitigate against unnecessary downtime
  • Ensure your rig is fit for purpose
  • Identify drilling operational and safety critical equipment
  • Improve crew competency
  • Improve safety
icon-chevron-lefticon-chevron-righticon-chevron-upicon-close-circleicon-closeicon-facebookicon-globeicon-insightsicon-instagramicon-linkedinicon-logo-largeicon-logo-originalicon-logo-sgc-largeSGC Engineering LLCA Vysus Group Companyicon-menuicon-newsicon-searchicon-sectorsicon-servicesicon-statsicon-studyicon-twittericon-webinaricon-youtubevysus-leaf-optim