Client Challenge
The client was undertaking a major brownfield development project aimed at maximising the long-term value of a mature offshore asset through production optimisation, increased export capacity and electrification of offshore facilities through power from shore. The project involved significant modifications to existing facilities, introducing new modules, equipment, and potential risk scenarios that required thorough assessment to ensure continued safe and compliant operations.
To support project development and decision-making, the client required a comprehensive range of safety studies to identify, assess, and manage risks associated with the proposed modifications. Vysus was engaged to deliver key safety assessments, supporting regulatory compliance, risk reduction, and the safe design and execution of the project.
How we helped
Vysus supported the project throughout multiple phases, from the feasibility phase, via Front-End Engineering Design (FEED) phase, to the engineering, procurement, construction and installation (EPCI) phase.
Our team conducted a wide range of safety and risk studies, helping the client identify hazards, evaluate risk, assess the impact of design decisions, and demonstrate compliance with regulatory requirements. The studies provided important input to the design and supported the client in making informed decisions throughout the project.
Our work covered several aspects of the new modules and its integration with the existing facilities. Several types of CFD analyses were carried out to support key design and safety decisions. These included assessments of structural response to fire, which provided input to the evaluation of the need for passive fire protection. Other fire consequence analyses provided the basis for determining the required dimensions and extent of new and extended fire walls. Furthermore, explosion risk assessments for the new modules were carried out, providing input to the design and identification of appropriate risk-reducing measures.
We also assessed thermal and environmental conditions that could influence personnel safety, operations and escape arrangement. This included assessments of heat radiation from flare and exhaust systems, together with CFD analyses evaluating how the proposed structural modifications could affect airflow conditions, turbulence and helicopter operability at the helideck. For the new modules, assessments of wind chill, weather exposure and escape routes were conducted to ensure acceptable working conditions and safe evacuation. Together, these studies provided the client with a robust basis for refining the design and implementing appropriate risk-reducing measures.
We also performed risk analyses covering both the future operational phase and the installation phase. The studies provided a structured assessment of potential hazards and their associated risks, supporting decision-making, risk reduction, and the implementation of appropriate safeguards throughout the project.
As the project matured, several of the analyses were updated and refined to reflect design developments and changing project assumptions. This ensured that safety considerations remained aligned with the evolving design and provided the client with consistent decision support throughout the different project phases.
Powerful results
• Enabled confident project progression
Provided the technical basis needed to evaluate safety implications of major facility modifications, helping the project mature from concept development through EPCI with safety considerations embedded in key decisions.
• Supported cost-effective and risk-informed design
Advanced CFD modelling and consequence analyses helped optimise fire protection, fire wall design, ventilation and other safety measures, ensuring solutions were aligned with the actual risk picture rather than conservative assumptions alone.
• Facilitated safe integration of new facilities
Evaluated how new modules would affect existing operations, personnel, critical equipment and helicopter activities, helping ensure safe integration into a live offshore installation.
• Maintained compliance throughout project development
Delivered the analyses and documentation required to demonstrate that safety risks were systematically identified, assessed and managed as the design evolved.