The industry standard for visualising the power system consists of nodes being positioned relative to each other, with respect to their geographical position, with straight lines representing cables and connections. During testing and verification of the online risk simulation tool, the need for new ways to visualise large networks rapidly became obvious.
Download our whitepaper and learn:
- A new methodology for representation of how changing risk level can be presented for power system operators
- A presentation of the online risk tool Promaps Online, currently running simulation of the Norwegian power system.
- The principles and background behind reliability calculations
- Visualising changes in a network over time, as different parts of the system will be prominent, depending on the current risk level in each area.
If you would like to speak to the author of the paper, Arne Brufladt Svendsen, VP Promaps technology, or to find out how we can help you, please contact arne.svendsen@vysusgroup.com